Sunday 22 June 2008

DALBEATTIE


BATHROOM FOR CUSTOMER WHO NEVER PAID

Monday 19 May 2008

ST. CUTHBERT ST




MADE TO MEASURE FRONT DOOR

Remove old door with unusual sizes. Make new door frame to overcome building movement. Make new door in hardwood with mortis&tenon joints, hang door, install locks and all brass hardware, including weather strip. Paint in gloss.

Saturday 10 November 2007

KELTON


DESCRIPTION: REMOVE AND REPLACE ORIGINAL 19thC SASH WINDOW. Remove old sash pair, manufacture replacement in hardwood from square section, remove and clean thin original stained glass, reinforce with new glass, install glass into new frame, and install on site, renewing old sash cords.

Sunday 21 October 2007

MOSTON TERRACE 3


PROJECT: CHILDREN`S BATHROOM
DESCRIPTION: Gutting old bathroom and creating new bathroom including plumbing, joinery, fitting appliances, tiling.

TOLLCROSS


PROJECT: DESIGN MAKE AND FIT DOUBLE GLAZED COMPLETE SASH AND CASEMENT WINDOW.
DESCRIPTION: Remove old sash & casement window, weights, etc, board up temporarily. Manufacture new sash & Casement in hardwood, to suit double glazed panels, including cutting and profiling timber section, increasing weights, and installing. Brass ironmongery.

Sunday 14 October 2007

TIMBERBUSH



PROJECT: BUILT IN SECURE FILE STORAGE
DESCRIPTION: Design and build floor to ceiling cupboards for storage and to disguise electrical boxes and cabling, sliding doors with locks.

SUGAR BOND OFFICES


PROJECT: CREATE ARCHWAY OPEN PLAN IN FIREWALL, DECOR.
DESCRIPTION: Remove 15metre section of firewall, create archway, reconstruct steel partition, re-plaster. Scarufy and paint existing original brick vaulted ceiling with propretry paint. Paint all walls, steel staircase and front glazing panels.